What was found
DURING PHASE 1 INSPECTION, MAINTENANCE FOUND AFT PROPELLER SPINNER BULKHEAD CRACKED AT ONE FLANGE BY THE PROPELLER BLADE CUT OUT ON ONE SIDE. REPLACED PROPELLER AFT SPINNER BULKHEAD & REINSTALLED PROPELLER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING PHASE 1 INSPECTION, MAINTENANCE FOUND AFT PROPELLER SPINNER BULKHEAD CRACKED AT ONE FLANGE BY THE PROPELLER BLADE CUT OUT ON ONE SIDE. REPLACED PROPELLER AFT SPINNER BULKHEAD & REINSTALLED PROPELLER.