What was found
BS 287, RBL 14 - LBL 10, FLOORBEAM GOUGED. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED SECTION AND SPLICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 287, RBL 14 - LBL 10, FLOORBEAM GOUGED. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED SECTION AND SPLICES.