What was found
IN CRUISE THE RUDDER TRIM FROZE. ATTEMPTS TO TROUBLESHOOT WITH THE CAPTAIN WERE UNSUCCESSFUL. DIVERTED TO ORD. NO EMERGENCY DECLARED. REPLACED CENTER PCU, REPLACED RUDDER TRIM MODULE AND RUDDER TRIM POSITION INDICATOR, REPLACED RUDDER TRIM ACTUATOR. REPAIRED SEVERAL BENT PINS ON CONNECTOR D5300J. ADJUSTED AND TESTED RUDDER PER MM 27-21-00. REPLACED CENTER PCU. ACCOMPLISHED REPLACEMENT OF THE RUDDER FEEL CENTERING & TRIM MECHANISM IAW MM 27-21-10 PAGE 214.