What was found
CABIN STATION 827 STRINGER 9R FRAME IS CRACKED. MAJOR REPAIR ACCOMPLISHED. DOUBLER REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CABIN STATION 827 STRINGER 9R FRAME IS CRACKED. MAJOR REPAIR ACCOMPLISHED. DOUBLER REPAIR.