What was found
FUSELAGE FRAME BODY STATION 847 STRINGER 9R CRACKED THROUGH RIVET. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED NEW ANGLE AND FILLER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FRAME BODY STATION 847 STRINGER 9R CRACKED THROUGH RIVET. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED NEW ANGLE AND FILLER.