What was found
CABIN FLOORBEAM AT STATION 365 STRINGER 17R HAD EXCESSIVE MATERIAL REMOVED DURING CORROSION CLEAN UP BETWEEN RBL 10 OUT TO 64 RBL ON THE UPPER T-CAP SURFACE. MAJOR REPAIR ACCOMPLISHED. REPLACEMENT T-CAP INSTALLED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CABIN FLOORBEAM AT STATION 365 STRINGER 17R HAD EXCESSIVE MATERIAL REMOVED DURING CORROSION CLEAN UP BETWEEN RBL 10 OUT TO 64 RBL ON THE UPPER T-CAP SURFACE. MAJOR REPAIR ACCOMPLISHED. REPLACEMENT T-CAP INSTALLED.