What was found
AT C-CHECK, FOUND VERTICAL STAB AT FIN STATION 316, HORIZONTAL STAB HINGE FITTING BEARING HOLE, LT SIDE, HAS CORROSION ON INSIDE DIAMETER. REWORK VERTICAL STAB, HORIZONTAL STAB HINGE FITTING BEARING HOLE AT LEFT SIDE AND INSTALLED NEW BEARING. (M)