What was found
BS 616L FRAME CRACKED BELOW FLOOR. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED DOUBLER REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 616L FRAME CRACKED BELOW FLOOR. MAJOR REPAIR ACCOMPLISHED. FABRICATED AND INSTALLED DOUBLER REPAIR.