What was found
AILERON, ELEVATOR, AND RUDDER SYSTEMS PRIMARY CONTROL CABLES ARE DUE INSPECTION AT 600 HOURS IAW MM, AS A PORTION OF PHASE B REQUIREMENTS. ALIERON, ELEVATOR AND RUDDER SYSTEMS PRIMARY CONTROL CABLES ARE DUE REMOVAL AND DETAILED INSPECTION AT 4,800 HOURS IAW MM. PRIMARY FLIGHT CONTROL CABLES ARE NOT LISTED MM (REPLACEMENT SCHEDULE). INSTALLED NEW RUDDER CONTROL CABLES, (PN7627202004-001, 7627202003-001). WORK PERFORMED AFTER INSPECTION IAW PHASE B REQUIREMENTS. (K) (CE09200502303)