What was found
FUSELAGE FRAME AT STA 600 BETWEEN STR 24L AND 24L REQUIRE DTA TO BE ACCOMPLISHED. REMOVED FRAME SECTION AND FABRICATED REPAIR PARTS PER REO G09843 REV 1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FRAME AT STA 600 BETWEEN STR 24L AND 24L REQUIRE DTA TO BE ACCOMPLISHED. REMOVED FRAME SECTION AND FABRICATED REPAIR PARTS PER REO G09843 REV 1.