What was found
LIGHTNING STRIKES LT HORIZONTAL STAB UPPER SURFACE, INBOARD END. LIGHTNING STRIKES LT HORIZ STAB UPPER SURFACE, INBD END. A MAJOR REPAIR WAS INSTALLED PER REO-G1067A & EVA-50377. THIS COMPOSITE REPAIR IS INTERIM (FOR 24 MONTHS - 10JUN07) OR NEXT SCHEDULED 'C' CHECK (09OCT06), WHICHEVER COMES FIRST. THIS REPAIR MUST BE REINSPECTED EVERY 500 FLIGHT-CYCLES WITH MAXIMUM LIMIT AT 3,000 FLIGHT-CYCLES. N-R U1634H. MF 4982 WAS CREATED TO MONITOR THIS TEMPORARY REPAIR.