What was found
WHILE COMPLYING WITH SB, FOUND 2 HYDRAULIC LINES PN MY20751107 AND MY20751207 CHAFED 20 PERCENT OF WALL THICHNESS LINES REPLACED. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE COMPLYING WITH SB, FOUND 2 HYDRAULIC LINES PN MY20751107 AND MY20751207 CHAFED 20 PERCENT OF WALL THICHNESS LINES REPLACED. (K)