What was found
UPPER FUSELAGE 3 SCRATCHES BETWEEN BS 277-294.5 STR 2L - 3L. BLENDED DAMAGE, OUT OF LIMITS. REMOVED DAMAGE, FABRICATED DOUBLER, TREAT PRIME PAINT. INSTALLED DOUBLER AT AARIMC PER SRM 53-00- 01 PROCEDURE V, REPAIR 31 PAGE 203-210, 215 & 231.