What was found
DURING OPERATIONAL CHECK OF DOOR 4R POWER ACTUATING SYSTEM AND ESCAPE SLIDE, NR 2 PILLAR DID NOT FULLY INFLATE AND PRESSURE RELIEF VALVE ON RT SIDE STUCK OPEN. ACCOMPLISHED QUALITY ASURANCE OPERATIONAL CHECK OF DOOR 4R POWER ACTUATING SYSTEM AND ESCAPE SLIDE. NR 2 PILLAR DID NOT INFLATE FULLY & PRESSURE RELIEF VALVE (PRV) ON RH SIDE STUCK OPEN AS REPORTED. PRV WAS IMPROPERLY CALIBRATED. NORMAL MIN IS 2.3 PSIG AND MAC IS 2.8 PSIG. STUCK OPEN EXCEEDED MIN VALUE. ALSO, THE SLIDE SHEAR PIN ON NR 2 PILLAR FAILED TO SEPARATE WHICH PREVENTED FULL INFLATION OF THE PILLAR. SUSPECT TIME-IN-CONTACT CAUSED ADHESION OF SLIDE PARTS.