What was found
DURING COMPLIANCE WITH AD 2000-01-16 THE TAIL PIPE ON THE RT ENGINE WAS FOUND WITH A 6 INCH CRACK. THE LAST INSPECTION WAS 40 HRS PRIOR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING COMPLIANCE WITH AD 2000-01-16 THE TAIL PIPE ON THE RT ENGINE WAS FOUND WITH A 6 INCH CRACK. THE LAST INSPECTION WAS 40 HRS PRIOR.