What was found
FWD CARGO PIT CORROSION AT FRAME 27 SHEAR TIES BETWEEN STR 43 & 44 LT, 42 & 43 RT, 41 & 42 RT AND FRAME 24 SHEAR TIE BETWEEN STR 42 & 43 RT. MAJOR REPAIR ACCOMPLISHED: REPLACED SHEAR TIES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FWD CARGO PIT CORROSION AT FRAME 27 SHEAR TIES BETWEEN STR 43 & 44 LT, 42 & 43 RT, 41 & 42 RT AND FRAME 24 SHEAR TIE BETWEEN STR 42 & 43 RT. MAJOR REPAIR ACCOMPLISHED: REPLACED SHEAR TIES.