What was found
FWD CARGO PIT CORROSION AT FRAME 29 SHEAR TIES AT STR 43 & 44 LT, 41 & 42 LT, 40 & 41 LT AND 41 & 42 RT. MAJOR REPAIR ACCOMPLISHED: REPLACED SHEAR TIES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FWD CARGO PIT CORROSION AT FRAME 29 SHEAR TIES AT STR 43 & 44 LT, 41 & 42 LT, 40 & 41 LT AND 41 & 42 RT. MAJOR REPAIR ACCOMPLISHED: REPLACED SHEAR TIES.