What was found
FWD CARGO BAY FRAME AT STA 500 CORRODED STA 499 - 500 LBL 3 TO LBL 3 WL 148-150. MAJOR REPAIR ACCOMPLISHED: FABRICATED & INSTALLED FRAME SHEAR TIE DOUBLER REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FWD CARGO BAY FRAME AT STA 500 CORRODED STA 499 - 500 LBL 3 TO LBL 3 WL 148-150. MAJOR REPAIR ACCOMPLISHED: FABRICATED & INSTALLED FRAME SHEAR TIE DOUBLER REPAIR.