What was found
RIGHT MLG AFT SUPPORT BEAM FITTING IS CRACKED AT THE 12:00 AT THE 3:00 AND AT THE 6:00 O'CLOCK POSITIONS AT THE REAR SPAR ATTACHMENT. MAJOR REPAIR ACCOMPLISHED: REPLACED RIGHT MLG SUPPORT FITTING.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT MLG AFT SUPPORT BEAM FITTING IS CRACKED AT THE 12:00 AT THE 3:00 AND AT THE 6:00 O'CLOCK POSITIONS AT THE REAR SPAR ATTACHMENT. MAJOR REPAIR ACCOMPLISHED: REPLACED RIGHT MLG SUPPORT FITTING.