As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
UPON INSPECTION OF A PHASE II INSPECTION, IT WAS DISCOVERED THAT THE WIRE BUNDLE MOUNT PN S26062 THAT HOLDS THE FLAP MOTOR WIRE HARNESS HAD DETACHED FROM THE RIB IN THE RT WING AND HAD ALLOWED THE WIRE BUNDLE TO CHAF INTO THE INSPECTION PANEL SUPPORT ON THE WING. THE WIRE BUNDLE HAD (2) WIRES CHAFED THROUGH THE INSULATION AND WAS IN CONTACT WITH THE BARE WIRE. RECOMMEND INSPECTION OF THESE MOUNTS AND REPLACE AS NEEDED, OR ON CONDITION. (K)