As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FLOORBEAM ITEM 250 HAS CORROSION. ACCOMPLISHED MAJOR REPAIR AT DEN. REMOVED BEAM, BEAM ON WORK TABLE. CONT OF AMIS ITEM 0912010: PICKED UP HOLES FOR BARREL NUT FITTINGS AND SPLICE ANGLES ON NEW BEAM. CONT OF AMIS ITEM 0912017: CONTINUED WORKING BEAM PART ON WORK TABLE. CONT OF AMIS ITEM 0912024: INSTALLED BEAM 250- NEEDS RIVETS FOR SHEAR PLATE INSTALLED.