What was found
BEAM 95 CORRODED. REMOVED FLOORBEAM 95. REMOVED BRACKETS AND DRILLED NEW BEAM AND READY FOR BRACKET INSTALL. ALL BRACKETS AND ATTACH FITTINGS INSTALLED AND READY FOR INSTALLATION INTO AC. BEAM INSTALLED, ATTACHMENT COMPLETE AT FRAME 64, NEEDS BOLTS AT FRAME 66 AND 65. COMPLETED INSTALLATION OF BEAM. FOUND SERVICEABLE.