What was found
DOOR R2 REQUIRES DOUBLER AT UPPER HINGE CUTOUT. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DOOR R2 REQUIRES DOUBLER AT UPPER HINGE CUTOUT. MAJOR REPAIR ACCOMPLISHED. INSTALLED DOUBLER REPAIR.