What was found
THIS PROP WAS PURCHASED NEW AND INSTALLED, IT HAS BEEN OVERSPEEDING BY 25-50 RPM. SENT IT TO BE REPITCHED AND THAT CORRECTED THE ISSUE. RECORDS INDICATE THAT IT SHOULD BE AN APPROPRIATE PROP FOR THIS ENGINE/ AIRCRAFT.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THIS PROP WAS PURCHASED NEW AND INSTALLED, IT HAS BEEN OVERSPEEDING BY 25-50 RPM. SENT IT TO BE REPITCHED AND THAT CORRECTED THE ISSUE. RECORDS INDICATE THAT IT SHOULD BE AN APPROPRIATE PROP FOR THIS ENGINE/ AIRCRAFT.