What was found
PIC WAS FORCED TO LAND USING ELEVATOR PITCH CONTROL DUE TO ELEVATOR JAMMING AFTER CONTROL COLUMN INTERNAL SLIDE ATTACH SCREW CAME LOOSE. ACFT RECORDS SHOW THAT SB98-27-04, DATED JUNE 1, 1998, SPECIFICALLY PERTAINS TO AN INSPECTION OF THIS SCREW, AND WAS ALLEGEDLY COMPLIED WITH IN JUNE OF 1998. A CONDITION REPORT, NR 223986, WAS FILED IN MFG SYSTEM, BUT HAS NOT BEEN REVIEWED AS OF THIS DATE.