Service difficulty report · Diode · Gulstm 114B

Difficulty date
June 18, 2011
Submitted
July 26, 2011
Operation
General aviation
Aircraft
N115CK
Make and model
Gulstm 114B
Aircraft serial
14680
Aircraft time
432 hours
Engine
Lyc IO540T4B5
Engine time
5 hours
Propeller
Mcauly B3D32C417
Part
Diode
Part number
NTE5814
Condition
Burned Out
Location
Zone 200
Part time
5 hours
Stage of operation
CR
How discovered
O
Nature of condition
B
Precautionary procedure
H, A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AIR CONDITIONING/ALTERNATOR NR 2 SYS PROBLEM GENERATED SMOKE IN THE COCKPIT. ACFT PERFORMED PRECAUTIONARY LANDING. PROBLEM WAS IDENTIFIED BY MX AND SYS WAS DISABLED AND PLACARDED "INOPERATIVE" FOR A FLT TO HAVE ADDITIONAL REPAIRS MADE. TROUBLESHOOTING REVEALED THE SOURCE OF THE SMOKE TO BE FROM A DIODE BEHIND THE RT SIDE PANEL, IN BETWEEN WIRES M509B18 & M500A18. DIODE GOT VERY HOT, EMITTED ELECTRICAL BURNING ODOR, THEN PHYSICALLY SEPARATED & ELECTRICALLY OPENED, AFTER 15 MINUTES OF SYS OPS DURING TROUBLESHOOTING. RAN VARIOUS SYS TEST WIRES TO MULTIPLE SPOTS IN SYS CIRCUITRY AND PUT AMMETERS IN-LINE AT NR 2 VOLTAGE REGULATOR AND AIR CONDITIONER COMPRESSOR MOTOR & BROUGHT ALL TEST LINES INTO COCKPIT FOR TROUBLESHOOTING RUNS. SOLDERED NEW DIODE INTO LINE FOR TESTING. RAN ACFT SEVERAL TIMES FOR TROUBLESHOOTING, AND JUMPING OUT COMPONENTS & LINE SEGMENTS TO RECORD CHANGES. JUMPED ALL WIRING OUT FOR THE K-24 PUSH TO TEST RELAY, AND MINIMIZED THE CURRENT DRAW AT THE NR 2 VOLTAGE REGULATOR RED WIRE M500C13 WHICH IS TAPPED BETWEEN WIRES M509B18 AND M500A18. REMOVED RELAY K-24 AND BENCH TESTED OK. REINSTALLED RELAY K-24 AND RESOLDERED ALL WIRE CONNECTIONS. RAN UP AND CONFIRMED SIGNIFICANTLY DECREASED CURRENT DRAW AT THE NR 2 VOLTAGE REGULATOR RED WIRE M500C13 THROUGH THE DIODE CONFIRMING THAT THERE MUST HAVE BEEN HIGHER THAN NORMAL RESISTANCE IN THE K-24 RELAY COIL SOLDER JOINTS AT CONTACTS NR 2 OR NR 9 CAUSING INCREASED AMPERAGE DRAW THROUGH THE DIODES. INSTALLED A NEW PN NTE5814 DIODE IN BETWEEN WIRES M509B18 AND M500A18. REMOVED ALL ADDITIONAL WIRING AND AMMETERS INSTALLED FOR TESTING. REASSEMBLED ALL OF THE INSTRUMENT PANEL AND RT SIDE PANEL COMPONENTS DISASSEMBLED FOR ACCESS. RAN UP ACFT, AND TEST FLEW FOR .5 HOURS WITH THE AIR CONDITIONER ON, WITH NO DEFECTS NOTED.