Service difficulty report · Seal · Cirrus SR20

Difficulty date
January 26, 2023
Submitted
January 26, 2023
Operation
General aviation
Aircraft
N46VU
Make and model
Cirrus SR20
Aircraft serial
2444
Aircraft time
2,128 hours
System (JASC)
5751 · Ailerons
Part
Seal
Condition
Departed
Location
Lt Wing
Stage of operation
NR
How discovered
O
Nature of condition
D
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SINCE PURCHASING THE AIRCRAFT AILERON GAP SEALS HAVE DEPARTED IN FLIGHT SEVERAL TIMES. 6 INSTANCES REQUIRED SPECIAL FLIGHT PERMITS TO RELOCATE THE AIRCRAFT TO ENVIRONMENTALLY CONTROLLED HANGARS. THERE WERE AT LEAST 2 OTHER OCCURRENCES THAT DID NOT REQUIRE SPECIAL FLIGHT PERMITS. WE HAVE A FLEET OF 8 CIRRUS SR20. WHEN WE RECEIVED THE AIRCRAFT WE WERE INFORMED BY THE INSTRUCTORS WHO WORKED WITH US THAT THE GAP SEALS ARE PART OF THE TYPE CERTIFICATE AND THAT THEY ARE PRONE TO DEPARTING THE AIRCRAFT. WE HAVE MOST FREQUENTLY SEEN THIS ISSUE THE FIRST FEW TIMES EACH YEAR THAT THE TEMPERATURE GETS VERY COLD. I BELIEVE CIRRUS IS WELL AWARE OF THE ISSUE AND AM DISAPPOINTED THAT NO FIX OR SB HAS BEEN ISSUED TO CORRECT THE PROBLEM OR AT LEAST REDUCE THE NEED FOR OBTAINING SPECIAL FLIGHT PERMITS.

More about the Cirrus SR20