Service difficulty report · Transmission · Hughes 369E

Difficulty date
December 19, 2023
Submitted
December 22, 2023
Operation
General aviation
Aircraft
N716KV
Make and model
Hughes 369E
Aircraft serial
0407E
Aircraft time
8,848 hours, 8,742 cycles
Part
Transmission
Part number
369D25100507
Part serial
0494
Condition
Installed
Location
Zone 200
Stage of operation
CR
How discovered
V
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A 135 TOUR OPERATION EXPERIENCED A MAIN ROTOR TRANSMISSION CHIP LIGHT RESULTING IN A PRECAUTIONARY LANDING. ANOTHER HELICOPTER WAS BROUGHT IN WITH MAINTENANCE PERSONNEL AND BROUGHT ALL PASSENGERS BACK TO THE AIRPORT. THE MAIN ROTOR CHIP DETECTORS WERE INSPECTED AND NOTED LIGHT FUZZ WITH A SINGLE SMALL SLIVER CAUSING THE LIGHT TO ILLUMINATE. THE CHIP DETECTORS WERE CLEANED AND THE TRANSMISSION DRAINED AND FLUSHED PER MANUFACTURERS PUBLICATIONS. THE AIRCRAFT CONDUCTED AN OPERATIONAL FLIGHT CHECK PRIOR TO DEPARTING THE SAFE LANDING SITE WHICH WAS COMPLETED WITHOUT ISSUE AND THE AIRCRAFT WAS FLOWN BACK TO THE AIRPORT. UPON LANDING THE TRANSMISSION FLUID WAS AGAIN FLUSHED WITH ANOTHER OPERATIONAL CHECK FLIGHT WITH NO METAL NOTED ON THE CHIP DETECTORS. FOLLOW UP MAINTENANCE REQUIRED AFTER FOUR HOURS OF FLIGHT TIME PER MANUFACTURERS PUBLICATIONS. THE AIRCRAFT EXPERIENCED A SECOND CHIP LIGHT PRIOR TO ACCUMULATION OF FOUR HOURS AND THE MAIN ROTOR TRANSMISSION WAS REMOVED FROM SERVICE.

More about the Hughes 369E