Service difficulty report · Ring

Difficulty date
January 20, 2025
Submitted
January 20, 2025
Operation
General aviation
Filed by
HK0Y765N
Hong Kong Aero Engine Services Limited
Aircraft
N51283
Engine
Rroyce RB211TRENT89
Engine time
83,032 hours, 10,335 cycles
Part
Ring
Part number
LK30089AND479626
Part serial
NA
Condition
Missing
Location
Engine
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AESL REPORTED 1 OFF CRACK INDICATION FOUND ON THE PRESSURE FACE OF SERRATION LOCATION 8 OF LP TURBINE STAGE 5 DISC, EXTENDING FROM THE SERRATION TOP FACE TO THE SERRATION PRESSURE FACE OF ESN 51283. THE LENGTH OF REPORTED CRACK ON THE PRESSURE FACE OF SERRATION 8 IS MEASURED AS 0.246IN., AND MEASURED AS 0.111IN. O N THE RIM 6A. THERE WAS NO ACCEPTANCE LIMITS ON CRACKED SERRATIONS 8 PROVIDED BY EM. IN REFERRING TO PAST EXPERIENCE, “THE REPORTED CONDITION IS EXCESSIVE AND CANNOT BE ACCEPTED OR REPAIRED”. THE LPT STAGE 5 DISC IS REJECTED BY ROLLS ROYCE'S TV (TV287378) AT CSN:10,335 STANDARD DUTY CYCLES (SDC). IN ACCORDANCE WITH THE TIME LIMITS MANUAL 05-10-01-800-801, THE DECLARED LIFE OF THE LOW PRESSURE TURBINE (LPT) STAGE 5 DISC (P/N:FK24200) IS 15,000 STANDARD DUTY CYCLES (SDC). HENCE THE LPT STAGE 5 DISC IS RETIRED BEFORE THE COMPLETION OF ITS FULL LIFE. THIS INCIDENT IS ALSO REPORTED TO ROLLS-ROYCE FOR FURTHER ASSESSMENT