What was found
G7500 8 PERSON LIFERAFT ASSY RECEIVED IN PACKED CONDITION. DURING TRIAL INFLATION, UNIT WAS FAILED DEPLOYMENT. PREPARATION FOR THE TRIAL INFLATION TEST WAS PERFORMED, INCLUDING A RESERVOIR PRESSURE CHECKED. THE RECORDED PRESSURE OF 3423 PSI MEETS THE REQUIRED LIMITS SPECIFIED IN THE CMM. A DISCREPANCY WAS OBSERVED, THE EXTERNAL MOORING LINE WAS ROUTE AROUND THE LIFERAFT AND PASSED BENEATH THE VACUUM BAG.