What was found
ENGINE WAS INSTALLED JULY 2025. TIME SINCE OVERHAUL IS 100 HOURS. FOUND ENGINE DAMAGE DUE TO LEFT MAG BEING ADVANCED 15 DEGREES. PULLED ENGINE AND SHIPPED BACK TO AVIAN AERONAUTICS FOR REPAIR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ENGINE WAS INSTALLED JULY 2025. TIME SINCE OVERHAUL IS 100 HOURS. FOUND ENGINE DAMAGE DUE TO LEFT MAG BEING ADVANCED 15 DEGREES. PULLED ENGINE AND SHIPPED BACK TO AVIAN AERONAUTICS FOR REPAIR.