What was found
CORROSION WAS FOUND IN THE NOSE LANDING GEAR ACTUATOR TUNNEL AROUND A HYDRAULIC LINE STANDOFF. DURING THE REPAIR A HOLE WAS MISLOCATED NEAR THE DEFECT. THE CORROSION WAS REMOVED AND NDT WAS ACCOMPLISHED TO VERIFY REMAINING MATERIAL THICKNESS AND THAT NO CRACKS EXIST IN THE AREA. A DOUBLER WAS FABRICATED AND INSTALLED AT THE DEFECT LOCATION. ALL WORK WAS ACCOMPLISHED IAW AQRD ENGINEERING REPAIR ORDER ERO-991251 REVISION A, DATED: SEPT 09, 2026. THE REPAIR DOES NOT REQUIRE ANY ICA.