What was found
DAMAGE TO THE RH EDGE FRAME Z CHANNEL, IN THE FORM OF CORROSION, WAS FOUND AT SEVERAL LOCATIONS FWD AND AFT OF FUSELAGE STATION 1405 MM. DAMAGE AFT OF FUSELAGE STATION 1405 MM WAS REMOVED, AND A FABRICATED Z CHANNEL WAS SPLICED IN. DAMAGE FWD OF FUSELAGE STATION 1405 MM WAS REPAIRED BY FABRICATING AND INSTALLING A L SHAPED DOUBLER. A DETAILED DESCRIPTION OF THE APPROVED REPAIR PROCEDURES IS PROVIDED IN AIRBUS REPAIR DESIGN APPROVAL SHEET RDAS-EC130-53-2024-0040, ISSUE A DATED 09 JAN 2024.