What was found
ENGINE WAS DISASSEMBLED FOR PROP STRIKE INSPECTION. FOUND LIFTERS BEGINNING TO SPALL AND WERE REPLACED WITH NEW LIFTERS AT THIS TIME TO PREVENT DAMAGE TO CAMSHAFT. LIFTERS WERE INSTALLED IN MAY OF 2010 AND HAVE 303.7 HOURS SINCE NEW.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ENGINE WAS DISASSEMBLED FOR PROP STRIKE INSPECTION. FOUND LIFTERS BEGINNING TO SPALL AND WERE REPLACED WITH NEW LIFTERS AT THIS TIME TO PREVENT DAMAGE TO CAMSHAFT. LIFTERS WERE INSTALLED IN MAY OF 2010 AND HAVE 303.7 HOURS SINCE NEW.