What was found
CREW REPORTS THAT EMERGENCY LIGHT TEST TAKES A FEW ATTEMPTS TO TEST CORRECTLY. REPLACED ALL THREE TRANSMITTER BATTERY PACKS IN OVERHEAD PANELS. PERFORMED SYSTEM TEST IAW SERVICE CHECK. TEST NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CREW REPORTS THAT EMERGENCY LIGHT TEST TAKES A FEW ATTEMPTS TO TEST CORRECTLY. REPLACED ALL THREE TRANSMITTER BATTERY PACKS IN OVERHEAD PANELS. PERFORMED SYSTEM TEST IAW SERVICE CHECK. TEST NORMAL.