What was found
CAM GEAR WAS IMPROPERLY INSTALLED/SEATED DURING MANUFACTURE, WHICH CAUSED EXCESSIVE WEAR AND DAMAGE TO THE CAM GEAR DURING ROTATION AGAINST THE DISTRIBUTOR GEAR. THIS WAS THE FIRST 500HR INSPECTION SINCE THE MAGNETO WAS MANUFACTURED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CAM GEAR WAS IMPROPERLY INSTALLED/SEATED DURING MANUFACTURE, WHICH CAUSED EXCESSIVE WEAR AND DAMAGE TO THE CAM GEAR DURING ROTATION AGAINST THE DISTRIBUTOR GEAR. THIS WAS THE FIRST 500HR INSPECTION SINCE THE MAGNETO WAS MANUFACTURED.