What was found
DURING CLIMB, THE NR 3 MANIFOLD FAIL LIGHT ILLUMINATED, AND THE PNEUMATIC PRESSURE ROSE TO 20 PSI. DUMPED 18,000 POUNDS OF FUEL AND RETURNED TO HNL. MANUALLY SHUT OFF THE PRESSURE REGULATOR VALVE AND DEFERRED THE NR 3 MANIFOLD SYSTEM PER MEL 36-1F.