What was found
DURING TAKEOFF, THE NR 1 ENGINE SLOW TO ACCELERATE WITH HIGH EGT AT 700 DEGREES. CREW FOLLOWED OPERATING MANUAL AND ABORTED TAKEOFF AT 40 KNOTS. MAINTENANCE REPLACED THE NR 1 ENGINE EVC, GROUND RUN TRIMMED, OPERATION AND LEAK CHECK TESTED NORMAL.