SDR 9520359953

Service difficulty report · Pt2 Probe · Doug DC931

Difficulty date
December 8, 1995
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N918RW
Make and model
Doug DC931
Aircraft serial
47158
Engine
Pwa JT8D9A
Part
Pt2 Probe
Condition
Malfunctioned
Location
Nr 1 Engine
Stage of operation
TO
Nature of condition
O
Precautionary procedure
C, D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR 1 ENGINE EPR INDICATION LOW ON TAKEOFF. THE TAKEOFF WAS ABORTED AND THE AIRCRAFT RETURNED TO THE GATE. MAINTENANCE CLEANED THE PT2 LINE, LEAK CHECKED THE PT2 SYSTEM AND REPLACED THE NOSE DOME/PT2 PROBE ASSEMBLY. SUBSEQUENT RUNUP WAS SATISFACTORY.

More about the Doug DC-9-31