What was found
DURING CLIMBOUT, COULD NOT CONTROL CABIN PRESSURIZATION. RETURNED TO DTW AND LANDED WITHOUT INCIDENT. PERFORMED VESSEL LEAK CHECK. REPLACED THE LEFT PACK SHUTOFF VALVE, CABIN CONTROLLER, AND PANEL. ALSO, REPLACED EQUIPMENT COOLING PRESSURE SWITCH AND PERFORMED HIGH PRESSURE BLEED CHECK, CHECKED OK.