What was found
STA 640, RBL 5 UPPER FLANGE OF FLOOR BEAM HAS EXFOLIATION CORROSION PILLOWED AND BLOWN OUT - REMOVED CORROSION AND INSTALLED DOUBLER REPAIR WITH 7075-T6 EXTRUSIONS AND A 15-5 STAINLESS STEEL STRAP, CAD PLOTED AND HEAT TREATED TO 180-200 RSI, TREATED AND PRIMED ALL SURFACES AS REQ'D. INSTALLED WITH FASTENERS AND FAYING SURFACE SEALER PER SRM 53-10-8.