What was found
DURING D-CHECK, FUS EXTERIOR GOUGE IN FUS SKIN EXTERIOR STR FS 950B AT STR 24L ('B' SYSTEM HYDRAULIC AREA). BURNISHED AREA PER SRM 51-10-1, NO CRACK NOTED, NDT TERMINATION BEYOND LIMITS. INSTALLED DOUBLER REPAIR PER SRM 53-30-3 18 INCHES BY 10 INCHES .071. TOTAL CYCLES 29577.