What was found
DURING D-CHECK, EXT FUS AT APPROX BS 950B STR 3L LIGHTENING STRIKE. REPAIRED LIGHTENING STRIKE AREA AS PER SRM 53-30-3. INSTALLATION OF DOUBLER 7 INCHES BY 12.5 INCHES 2024-T3 .090. TOTAL CYCLES 29577.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING D-CHECK, EXT FUS AT APPROX BS 950B STR 3L LIGHTENING STRIKE. REPAIRED LIGHTENING STRIKE AREA AS PER SRM 53-30-3. INSTALLATION OF DOUBLER 7 INCHES BY 12.5 INCHES 2024-T3 .090. TOTAL CYCLES 29577.