What was found
DURING D-CHECK, AFT CARGO HAS CORROSION ON AFT SIDE OF FUS FRAME 950E AT FWD LOWER CORNER OF DOOR FRAME AT APPROX STR 27R. REMOVED CORROSION PER SRM 51-10-6, CUT OUT DAMAGED SECTION OF WEB AND INSTALLED NEW SECTION PER SRM 51-40-2, 6 INCH BY 18 INCH 7075-T6 .090. INSTALLED SPLICE REPAIR PER SB 727-53-0199, 6 INCHES BY 14 INCHES 7075-T6 .090. TREATED AND PRIMED PER SRM 51-10-2. TOTAL CYCLES 32285.