What was found
DURING C-CHECK AND C.P.C.P. INSPECTION, FOUND FLOOR BEAM CORRODED AT BS 380, BL 0-10L, AND BL 10-40R. REMOVED DAMAGED SECTION OF FLOOR BEAM UPPER CHORD. FABRICATED REPAIRS WITH 7075-T6; .050 INCH, AND 7075-T6; .080 INCH, MATERIAL PER SRM 53-10-8 AND BOEING REPAIR FAX M-7272-95-0287. TREATED AND PRIMED PER SRM 51-10-2. INSTALLED PER SRM 51-30-2 AND SRM 53-10-8, FIGURE 3.