What was found
DURING C-CHECK INSPECTION, FOUND CORROSION DAMAGE ON UPPER CHORD OF THE BS 400, FLOOR BEAM FROM RBL 9.1 TO RBL 11.6. CUT OUT DAMAGED AREA, FABRICATED SHIMS, AND REPAIR ANGLES. TREATED AND INSTALLED PER BOEING REPAIR FAX M-7272-95, AND SRM 53-10-8, DATED JANUARY 16, 1995.