What was found
DURING INSPECTION, A .75 INCH CRACK WAS FOUND RADIATING UPWARD FROM THE AFT UPPER MOUNTING STUD FOR NR 4 CYLINDER. THE ENGINE HAD 732.9 HOURS SINCE BEING REBUILT BY THE FACTORY AND HAD BEEN IN SERVICE FOR 24 MONTHS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION, A .75 INCH CRACK WAS FOUND RADIATING UPWARD FROM THE AFT UPPER MOUNTING STUD FOR NR 4 CYLINDER. THE ENGINE HAD 732.9 HOURS SINCE BEING REBUILT BY THE FACTORY AND HAD BEEN IN SERVICE FOR 24 MONTHS.