What was found
MCI - DURING CHECK C-2D, FOUND .75 INCH CRACK IN TOP INBOARD CORNER OF NR 1 ENGINE AFT ENGINE MOUNT CASTING. REPAIRED BY INSTALLING DOUBLERS PER BOEING DWG 65C34994. AIRCRAFT TOTAL TIME: 61,014 HOURS; 40,930 CYCLES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MCI - DURING CHECK C-2D, FOUND .75 INCH CRACK IN TOP INBOARD CORNER OF NR 1 ENGINE AFT ENGINE MOUNT CASTING. REPAIRED BY INSTALLING DOUBLERS PER BOEING DWG 65C34994. AIRCRAFT TOTAL TIME: 61,014 HOURS; 40,930 CYCLES.