What was found
DURING D-CHECK, AFT CARGO HEAVY CORROSION IN STRINGER CHANNEL AND STRINGER CRACKED BELOW FUSELAGE FRAME 1010 AT STRINGER 29L. REMOVED SPLICE PER SRM 51-30-2. REMOVED CORROSION PER SRM 51-10-6, MATERIAL LOSS .002, TREATED ALODINE AND PRIMED PER SRM 51-10-2. INSTALLED SPLICE AND FASTENERS PER SRM 53-10-4. TOTAL CYCLES 29,577.