SDR 9616299910

Service difficulty report · Fuel Control · Doug DC931

Difficulty date
July 26, 1996
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N960N
Make and model
Doug DC931
Aircraft serial
47256
Engine
Pwa JT8D9
Part
Fuel Control
Condition
Malfunctioned
Location
Rt Engine
Stage of operation
TO
Nature of condition
J
Precautionary procedure
C, D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING TAKEOFF, RIGHT ENGINE EPR WOULD NOT REACH TAKEOFF SETTING AND RIGHT ENGINE ALSO HAD FIRE LOOP LIGHT ILLUMINATION. CREW ABORTED TAKEOFF AND RETURNED TO GATE WITHOUT INCIDENT. MAINTENANCE REPLACED FUEL CONTROL, PUMP ASSEMBLY, AND PRESSURE RATIO BLEED CONTROL VALVE. OPERATIONAL CHECK OK.